Wallaceburg pool reopens

Sydenham-Pool

The Wallaceburg pool was closed for most of the day, as a problem with the boiler was discovered over the weekend.

However, it has since reopened.

C-K Rec officials stated the water temperature dropped to 75°F as a result of the maintenance issue.

“The boiler that heats the pool water broke and they have been working on it since late last night,” said Wallaceburg Coun. Jeff Wesley.

Here is a full schedule of the Sydenham and District Pool.

- Advertisment -